Double skin office partitioning project, supplied and installed in Slough, 50mm thick partitioning with Rockwool insulation in between 2 sheets of solid partitioning, single glazed windows to 3 sondes and the back wall being all solid to cover up and existing wall, supplied with 1 single access door and 1 double door both with vision panels and key lockable, height is our standard 2.44m with a suspended ceiling, with a fascia board around the top and skirting board to the outside.

We have installed bagged insulation above the suspended ceiling to give better acoustic qualities, the room will be used for product testing prior to shipment to customers, these can also be used as warehouse offices and cleanrooms.

Finished in standard white, this was installed in 2 days in Slough.

Location

Slough

Project Length

2 Days

Project gallery

View the project

Like what you see?

Let's talk about your project

Get In Touch

If you have any requirements or unsure of any of the information on our website then please don’t hesitate to contact us.

Email us