Rochdale - Aerosol Cage

The aerosol cage was installed on the first floor of a mezzanine floor, the cage was scut around the existing floor supports and around the fire hydrant pipes, mesh for aerosol cages has to be max 25mm x 25mm, we can supply expended metal instead, supplied with 2 access doors into the cage, cage was fixed directly to the chipboard floor and to the underside of the chipboard floor at the head using a channel system.

The cage was finished in standard light grey and took 3 days to install due to the number of cuts around beams supports.