Steel Skin Partitioning Project

Partitioning was installed to create a show room for customers clients, store room, large production room and a office area all with suspended ceilings and LED lighting.

 

45 lin metres of partitioning with a suspended delinking over each area 4 in total build time 5 days, and all finished in standard grey, customer site was based in Cambridge. Front elevation of the partitioning was all solid glass solid partitioning as well as the internal wall into the office area from the production area,  supporting legs for the suspended ceiling had to be installed as it was over the max width of 7m we could span so these 3 legs where located inside the main production area. Customer to wire up the lighting and they will also install air conditioning to keep the areas cool.

Location

Cambridge

Project Length

Project gallery

View the project

Like what you see?

Let's talk about your project

Get In Touch

If you have any requirements or unsure of any of the information on our website then please don’t hesitate to contact us.

Email us